PROJECT
ENVIRONMENT IMPACT ASSESSMENT (EIA) 2017 COMPLETED PROJECTS
NO. | WORK DESCRIPTIONS | DURATION/ COMPLETION | CLIENT |
16. | EIA-PROPOSED GOLD MINING PROJECT AT LOT 5303 (PML 1/2016), LOT 5304 (PML 2/2016) & LOT 5558 (PML 3/2016) |
< 1 YEAR 2017 |
DAN TUNJONG SDN. BHD. |
17. | EIA-BATU KUARI OLEH PERBADANAN MENTERI BESAR (PMB) KEDAH DI ATAS PT 686 (H.S.D.) : 67318 MUKIM TERAP, DAERAH KULIM,KEDAH DARUL AMAN |
< 1 YEAR 2017 |
KUMPULAN DCT SDN. BHD. |
18. | EIA-PERLOMBONGAN BIJIH BESI DI ATS ML 579 LOT 11885 SELUAS 35.02 HA DAN ML 580 LOT 11886 SELUAS 15.00 HA KEDUA-DUANYA TERLETAK DI MUKIM LENGA, DAERAH MUAR. |
< 1 YEAR 2017 |
SYARIKAT LOMBONG BESI MASIRAN LADANG HUTAN SDN. BHD. |